Skip to main content
Home
About
Browse Collections
Browse Items
Contact
Search using this query type:
Keyword
Boolean
Exact match
Search only these record types:
Item
File
Collection
Simple Page
Advanced Search (Items only)
Search
Browse Items (217 total)
Browse All
Browse by Tag
Search Items
Collection: Chicago Drainage Collection
Previous Page
of 9
Next Page
Sort by:
Title
Creator
Date Added
Construction #83
Two cantilever conveyor cranes on the stand on the side of the Chicago Sanitary and Ship Canal as construction workers fill containers with debris.
Construction #84
Three cantilever conveyor cranes stand above a construction site on the Chicago Sanitary and Ship Canal.
Construction #85
A cantilever conveyor crane dumps 1.75 tons of rock onto a large pile during the construction of the Chicago Sanitary and Ship Canal.
Construction #86
A 500 pound dynamite blast goes off during the construction of the Chicago Sanitary and Ship Canal.
Construction #87
A 1050 pound dynamite blast explodes during the construction of the Chicago Sanitary and Ship Canal.
Construction #88
An aerial view shows a dynamite blast during the construction of the Chicago Sanitary and Ship Canal.
Construction #89
Workers load rocks into carts on railroad tracks for transport during construction at the Chicago Sanitary and Ship Canal.
Construction #90
Construction workers use a crane to lift and place large stone blocks in a retaining wall.
Construction #91
A landscape view shows construction taking place on the Chicago Sanitary and Ship Canal.
Construction #92
A wide view of the Chicago Sanitary and Ship Canal shows the progression of construction on the retaining wall.
Construction #93
Workers add large stone blocks to a retaining wall along the Chicago Sanitary and Ship Canal.
Construction #94
A large pile of broken rock stands at the end of the Chicago Sanitary and Ship Canal construction site.
Construction #95
Construction workers break up rock along the side of the Chicago Sanitary and Ship Canal.
Construction #96
Construction workers labor near a large pile of rock along the Chicago Sanitary and Ship Canal.
Construction #97
Large stone blocks form a stair-like end to a retaining wall under construction.
Construction #98
Workers begin to lay stone around metal pylons during construction at Bear Trap Dam.
Construction #99
Large stone tablets lie in groups near brick and stone structures under construction at Bear Trap Dam.
Construction #100
A landscape view shows progress on the stone and metal pylons making up a portion of the Bear Trap Dam.
Construction #101
Three workers stand on top of one of several stone and metal pylons under construction at Bear Trap Dam.
Construction #102
A landscape view shows several buildings along the banks of an unidentified waterway used during the construction of the Chicago Sanitary and Ship Canal.
Construction #103
Two men stand on a structure near the right bank of an unidentified waterway in an unidentified town.
Mini Dam #1
Water flows steadily over a mini dam located near an unidentified bridge.
Construction #104
An internal view shows wooden support beams underneath an unidentified structure.
Bridge #5
A truss bridge extends across the Chicago Sanitary and Ship Canal near "The Great Two Mile Curve" at Romeoville.
Bridge #6
A view of the Lockport Road Bridge taken from a car's viewpoint highlights the bridge's 645 foot and three inch length.
Previous Page
of 9
Next Page
Output Formats
atom
,
dc-rdf
,
dcmes-xml
,
json
,
omeka-xml
,
rss2