An aerial view taken from atop a cantilever conveyor crane during the construction of the Chicago Sanitary and Ship Canal shows the construction site and surrounding land.
A view from the top of the Bear Trap Dam shows water pouring on of the side of the dam nearly nine months after water was released from Lake Michigan into the Chicago Sanitary and Ship Canal.
An aerial view shows the top of the Bear Trap Dam and the surrounding waterways nearly nine months after water was released from Lake Michigan into the Chicago Sanitary and Ship Canal.
A landscape view shows the Bear Trap Dam surrounded by water more than ten months after water was released from Lake Michigan into the Chicago Sanitary and Ship Canal.