A man poses for a picture under a large cylinder built into the wall of the Bear Trap Dam at the base of the Chicago Sanitary and Ship Canal at Lockport.
Workers construct an additional structure atop the Bear Trap Dam more than ten months after water was released from Lake Michigan into the Chicago Sanitary and Ship Canal.
A view from the top of the Bear Trap Dam shows the Chicago Sanitary and Ship Canal nearly nine months after water was released from Lake Michigan into the canal.
A large conveyor system used to move shuttle cars full of earth excavated during the construction of the Chicago Sanitary and Ship Canal stands above a large pile of rubble.